Final
This rule requires: All sea scallop dredge vessels and all vessels landing more than 5 bushels (176.2 L) of sea scallops in the shell to offload all fish (as defined in 50 CFR 620.2, which includes sea scallops) within a specified 12-hour offloading period; and (2) all other vessels landing more than 40 pounds (18.1 kg) of shucked scallop to offload all sea scallops within a specified 12-hour offloading period.